|
|
 | Chandrayaan-1 spacecraft undergoing pre-launch tests
|  | Moon Impact Probe integration with Chandrayaan-1 spacecraft
|  | Moon Impact Probe
|  | Readying Chandrayaan-1 spacecraft for Thermovac test
|  | Fully integrated Chandrayaan-1 spacecraft (left) and loading it to Thermovac Chamber (right)
|
PSLV-C11 Liftoff
 | PSLV-C11 Liftoff
|  | PSLV-C11 Liftoff
|  | PSLV-C11 Lift0ff
|
PSLV-C11 On Launch Pad
 | PSLV-C11 on Launch Pad
|  | PSLV-C11 on its way to launchpad
|  | PSLV-C11 on its way to launchpad from Vehicle Assembly Building
|  | PSLV-C11 comming out from Vehicle Assembly Building
|  | PSLV-C11 at Vehicle Assembly Building
|
PSLV-C11 Third and Fourth Stages
 | Close-up view of PSLV-C11 fourth stage
|  | PSLV-C11 Vehicle stacked up to fourth stage
|  | Hoisting of third and fourth stages of PSLV-C11
|
PSLV-C11 Second Stage
 | Hoisting of PSLV-C11 Second Stage
|  | PSLV-C11 Second Stage with its VIKAS engine
|
PSLV-C11 First Stage
 | Loading of PSLV-C11 First Stage Nozzle End Segment
|  | PSLV-C11 First Stage Nozzle End Segment on its way to Vehicle Assembly Building
|  | Positioning of PSLV-C11 First Stage Nozzle End Segment over launch pedestal
|
PSLV-C11 Strap-on
 | Unloading a PSLV-C11 strap-on from transporter at Vehicle Assembly Building
|  | Fully Assembled First Stage surrounded by strap-ons of PSLV-C11
|
|